www.videolarm.comP 1 6 0 0CCTV Standard Steel PoleInstallation and Operation Instructions for the following model:P1600 Standard 16’ Steel PoleBefore
IMPORTANT SAFEGUARDS SAFETY PRECAUTIONSUNPACKINGSERVICE1 Read these instructions.2 Keep these instructions. 3 Heed all warnings 4 Follow
Limited Warranty for Moog Videolarm Products Moog Videolarm warrants these products to be free from defects in material or workmanship as follows:PROD
Part 1: Site Preparation!NOTE: Special attention must be paid to the size of the wiring conduit and its location within the
Part 1: Site Preparation3. FOR ANCHOR BOLT INSTALLATIONS: Pour concrete per manufacrurer’s directions. See Figure 3 for dimensions of the b
Part 2: InstallationFigure 7CAUTION: Pull all slack in the wiring as you lift the pole into position to keep
Jig AssemblyFigure 22. Place the short end of each Bolt into the outside holes of the Cross Strap. PlaceHex Nuts onto each Bolt and
Jig AssemblyFigure 6With Leveling Nuts6. If, due to conditions or other requirements, leveling nuts are needed, adjustments will
Product Registration/WarrantyThank you for choosing Moog Videolarm. We value your patronage and are solely committed to providing you with the highes
Comments to this Manuals