7 Operation Performing Functions Tests
© 2010 Moog GmbH User Manual RKP-II (CA53461-001; Version 2, January 2010) 49
7.1.2.6 Limiting the Maximum Flow
Fig. 27: Limiting the Maximum Flow
7.2 Performing Functions Tests
Performing Functions
Tests
Pre-Conditions:
Initial set-up of the pump is complete: Ö Chap. "7.1 Initial Pump Set-Up",
Page 43
The end caps on the through drive of the pump stages have been
removed.
It has been assured that the pump is being supplied with operating fluid.
The pump has been visually inspected, with particular attention given to
the lines and port connections.
Procedure:
1. Carry out the functions test in accordance with the instructions provided
by the machine / equipment manufacturer.
Pos. Description
1 Adjustment mandrel
2 Cap nut
3 Lock nut
Displacement
V [cm
3
/R] 1932456380100 140
Pos.1 WS 8 WS 12 WS 10
Pos. 2 WS 24 = 40 Nm +
10 Nm
WS 32 = 80 Nm +
10 Nm
WS 27 = 80 Nm +
10 Nm
Pos. 3 WS 24 = 50 Nm +
10 Nm
WS 32 = 90 Nm +
10 Nm
WS 27 = 90 Nm +
10 Nm
ΔV for 1 mm
adjusting
screw travel
(pitch
1.5 mm/R)
3.6 5.6 6.5 8.9 11.3 11.5
Tab. 13: Adjustments Limiting the Maximum Flow
The functions tests is performed to ensure that the pump has been
installed into the machine / equipment properly.