Jig Assembly
Figure 2
2. Place the short end of each Bolt into the outside holes of the
Cross Strap. PlaceHex Nuts onto each Bolt and fi nger tighten
(Figure 2).
Jig Assembly
Figure 3
3. Turn the Anchor Jig over and place Single Straps over the Bolts
(Figure 3). Use the inside hole of each strap. Place Hex Nuts
onto each Bolt and fi nger tighten.
Jig Assembly
Figure 4
7
25
/32 "
7
25
/32 "
11"
diameter
4. Before using the Anchor Jig verify that the center to center
dimensions between the bolts are even (Figure 4). If not, adjust
accordingly. Firmly tighten all Hex Nuts.
Jig Assembly
Figure 5
5. Standard installation without leveling nuts.
Without Leveling Nuts