SECTION 4: GETTING STARTED
DS2100 User's Manual
C27750-001 PAGE 4-13
4.11 High Power Application
Apply the appropriate 3-phase voltage (230Vac/400Vac) to the DS2100 controller and allow approximately 1.3 seconds
for the softstart sequence to complete. If the drive has been set up correctly and all errors removed the softstart relay
should close to indicate a successful soft start-up.
The “Continuous Bus Voltage” window provides an indication of the “Detected DC Bus Voltage”, ”Over Voltage Limit”
and “Under Voltage Limit”
“DS2100
→
Drive Setup
→
DC Bus Monitoring
→
Continuous Voltage”
Figure 4.18 DC Bus Voltages
Comments to this Manuals